Description
Seat post removed, cleaned and re-fitted with clamp correctly tightened to recommended torque
Brakes checked (new pads fitted if required)
Gears checked/re-aligned
Cranks checked & correctly tightened to recommended torque
Tyres checked and inflated correctly (replaced if required)
Headset and handlebar assembly checked and correctly tightened to recommended torque
Complete drive system removed including pedals, chainset, bottom bracket, chain, cassette and both derailleurs. All cleaned and refitted or replaced if worn
Frame wiped down and checked for damage/cracks
Wheels trued
Bike fully stripped down to the bare frame. Frame wiped down/checked for damage/cracks
Wheel hubs stripped down and re-greased
Headset removed and greased
Reviews
There are no reviews yet.